The Third Bow Tie Ride - October 5, 2008

  ‹ previous | up | next › Jump to: 1 | 2 | 3 | 4 | 5 | 6  
DSC01090.JPG
Ride leader explaining the upcoming right-hand turn
DSC01091.JPG
Ride leader explaining the upcoming straight-across maneuver
DSC01093.JPG
Crossing the Broad Canal draw bridge
DSC01094.JPG
Passing by the Mirant power plant
DSC01095.JPG
Under the (no-longer operational) draw bridge
DSCN1905
Pinch point as riders proceed up sidewalk ramp one by one
DSC01097.JPG
And continuing along the canal
DSCN1907
The Broad Canal used to be more than four times as long, extending past the Grand Junction railroad tracks
DSC01104.JPG
Past "Galaxy" (1990) in Kendall Square
IMG_0550.JPG
On Ames St, passing the MIT Media Lab
IMG_0552.JPG
Through MIT, past the Stata Center's biofiltration swale that collects and filters rain water runoff
DSC01110.JPG
Enjoying the day
IMG_0554.JPG
Having passed under MIT Bldg 9 in the background, preparing to cross Mass Ave
DSC01113.JPG
Recumbent youth
IMG_0556.JPG
Zig zagging past MIT's Kresge Oval
DSC01117.JPG
Sgt Murphy stopping traffic on Mass Ave
DSC01121.JPG
Along MIT's Amherst Alley
DSC01124.JPG
Queuing for the Martin Annis crossing of the Grand Junction railroad
DSCN1910
Another pinch point along the route ...
DSC01129.JPG
Turning from Waverly St onto Erie St